Before progressive assembly
Please assemble profiles on a flat floor with sufficient indoor space around;
2. Classify aluminum profiles according to specifications and spare parts;
3. Determine the total number of nuts and spare parts installed into the tank in advance
In the assembly
1. Bottom assembly
A. The aluminum profile guard is manufactured gradually from the bottom edge of the component
B. Connect according to the connecting head in the middle of the bottom edge
C. Put the nuts under the bottom profile.
2. Install the cylinder and the center column
A. Use shadow decoration to connect the corner
3. Install the upper side
Slide the aluminum profile into the parallel surface of the bottom edge of the pole, and then connect the embedded coupling.
4. Install adjusting foot holder and universal wheel
Rotate the sound card frame parts, install the universal wheel with adjusting foot, and tighten it.
5. Declare tightening to remove stains on the surface
Adjust the part of the profile while declaring tight, please use ethanol to eliminate the stains on the surface after installation
Contact person: Mr. Wang
Telephone: 15957496869
QQ: 2850410110
Zip code: 315137
Mail: manager@cnyinxin.com
Add: No. 6, Mingfeng Road, Yunlong Industrial Park, Yinzhou District, Ningbo city
Scan and contact us